Prefabricated steel structure warehouse/workshop

Project Introduction

The steel structure project of the hot processing cast steel workshop is a new plant project of Ghana Steel Casting Company at the end of 2006.
The total construction area is about 51192 square meters. It is a single-story heavy steel industrial building with a total length of 427.5m, a total of 37 axes, 12m column spacing, 87m width, 5 continuous spans, and a maximum span of 30m.
The steel column is a stepped steel column with a combined section, and the column foundation is a cup foundation.
The engineering volume of steel structure is about 11,000t.

Prefabricated steel structure warehouse/workshop