Prefabricated steel structure warehouse/workshop

Project Introduction

Due to rapid business expansion, the client company needed to build a new steel structure workshop to expand production. The construction is required to be completed within 3 months. The construction speed of the civil masonry model is too slow, the construction is troublesome, and the concrete has poor seismic performance, which is difficult to meet the needs of the owner and the project. The construction budget of the steel structure workshop is controllable, the construction is quick, and it is green and environmentally friendly. Moreover, the total construction area of the production workshop is more than 10,000 square meters, with a large span and high difficulty. Therefore, steel structure is an inevitable choice. The project requires wind pressure resistance: 0.35 KN/m², earthquake resistance level: Level 4, and service life of 50 years. After several comparisons and investigations, the customer finally chose us.

Get Free Quote

    Legend
    1. Your Name (required)
    2. Email Address (required)
    3. Country (required)
    4. Size
    5. Your Message

    * Required

    Leave a Comment