Prefabricated steel structure warehouse/workshop

Project Introduction

The C-B span of the joint steel structure factory building is a double-slope high span with a 30.15m eaves height, and the B-A span is a single-slope low span with a eaves height of 19.90m. Single-layer cranes are installed on the low-span part and double-layer cranes on the high-span part. The column spacing is 12m, and the span is 36m.
The steel column of the combined plant is a stepped steel column with a combined section, and the column foundation is a cup-shaped foundation.

Prefabricated steel structure warehouse/workshop

Get Free Quote

    Legend
    1. Your Name (required)
    2. Email Address (required)
    3. Country (required)
    4. Size
    5. Your Message

    * Required

    Leave a Comment